When a generator applies and accepts a
connection offer issued by UK Power Networks, and it is connecting to a GSP with no available materiality headroom, UK Power Networks will submit a Transmission Impact Assessment application to vary the BCA (Bilateral Connection Agreement).
Methodological Approach
Data is compiled from existing datashare between UK Power Networks and the National Energy System Operator.
Quality Control Statement
Quality Control Measures include:
Manual review and correct of data inconsistencies
Use of additional verification steps to ensure accuracy in the methodology
Assurance Statement
The Open Data Team and DSO Regional Development Team worked together ensure data accuracy and consistency.